Note: You need an administrative right for the project to which you want to add an action package!

Package of measures: A package of measures is a bundle of subordinate measures that is subordinate to the project level. In the action package, the time and effect plans of the subordinate actions are aggregated.

  1. Select the desired project and click with the right mouse button on the project level and select "Add package".
  2. or, after selecting the project, click on the plus symbol on the right above the project tree.
  3. You can now name the measure package in the project tree or in the profile.
  4. You can also move the measure package across projects using drag and drop.

 Attention! When you drag and drop, the measure package assumes the structure of the respective project. In this context, entered effects are lost. A corresponding warning is displayed.

Did this answer your question?