All Collections
Project Structure
Change / swap tree level
Change / swap tree level

Learn how to swap a tree level (e.g. from a measure to a package)

Jonas Steeger avatar
Written by Jonas Steeger
Updated over a week ago

Which permissions are required?

Owner or admin permission


Falcon allows you to transform tree items from on level (e.g. measure) to another (e.g. measure package).


When is this useful

If you realize, that a certain tree item was created on the wrong level you may simply change the latter. This often happens with measures, when the schedule/activities allow for too little detail. In this case, a transformation from a measure to a package makes sense. The former measure with its activities gets transformed to a package (former measure) with measures (former activities).


How to do it

  1. Right click on the item you would like to transform

  2. Chose where to transform it to

Done!


Where is the old tree item and its information/data?

The transformed tree item gets deleted. You may restore it from the bin.


Here you can find more about the project structure in Falcon.

Did this answer your question?